In the Internet era, $←"δthe IDC computer room is ≤₽ the hub of this Internet iα€ nformation output. Only by building a ¶high-availability ove" rall computer room envir§♥onment can the system hardware, s↓✘δ✘oftware, and data be protected fr<Ω<om external factors and e& ¥✔liminate the impact of envi£$↓∑ronmental factors on the informa≈σtion system. Therefore, the requireme₹★nts for the computer room are reβλasonable layout, advanced technolog∏∞<y, easy operation, and scientific man" agement to ensure the continuous, reli">αable, and safe operation of±λ↔< important equipment su₩ch as the host, storage, and net←♥≠™work. The environment of the com×←puter room must meet the requi•¥±≠rements of various electronic ∞¶ devices such as computer equipment,↕≠ network equipment, storage e↑α→γquipment, etc. for temperature, humidit☆¶y, cleanliness, electroma∑™gnetic field strength, noε∏®✔ise interference, safe× ty and security, leakage preve↑φ®ntion, power quality, vibra×tion, lightning protection, and groundiσ★∏ng. At the same time, it must provid∑× •e a comfortable and goo♠d working environment for× > the staff.
As an operator of Hanwei Co₹₩mmunication, IDC equipm®® ≥ent room is an indisp☆∏≠÷ensable core component of us. Many exεperiences and lessons have&" been accumulated in the £∑δ♠10-year history of operation and main÷→₽tenance. We continue to summ±φγarize and devote ourselves tβ©o building an IDC computer¥ελ room that is truly suitable ±λfor operators.
The overall construction of the co®€mputer room project generally includeγ≥s the following aspects: inte ₽×grated wiring, anti-static floor laying<₩, ceiling wall decoration, partiti≤Ω±on decoration, UPS powe✘£←λr supply, special constan×→♣t temperature and humidity air conditi€•oning, computer room environme♦★εnt and power equipment★☆₹α monitoring system, fresh air syste≥≈m, water leak detection, ☆♠Ground wire system, lightning p★§rotection system, access control, m♠δonitoring, fire protection, alarm, s"Ω↕hielding engineering, et£≤c.
With so many systems, this is an σextremely complex system. But for a lon✘< ™g time in the past, the model generally→ adopted by the industry is≥↔Ω very traditional, that §® is, the design unit is respφ"onsible for design; the construction§γ unit is responsible for constructε↓εion; the constructioβ♠πn is handed over to the operation a•×∏nd maintenance department↔↕↔, and finally the operation and mai♣™ntenance department is responsible↓>♣ for long-term maintenance,σ←∏& and in The long-term maintenaλ≈β←nce bears the design hidden ₹¥↔dangers, blind spots, defε ↓ects and even some unsolvabl☆∞e contradictions left by the design "≈unit and the constructio∞<♥φn unit, as well as the high ope©∞Ωration and maintenance '£₽∏costs brought about by these probleεms.
Hanwei Communications b§₹reakthroughly advanced the int×α ervention time of the operation an±₹d maintenance unit from the last £₹to the design stage directly. All de×¶ signs must use the results≠&∞ of operation and mainγ&tenance as the starting ±∏£point. For example, we will require t$♠♥he design of civil engineer™¶≥ing institutions to be based on c ₩ abinet placement standards, so t→♥hat the pillars and beam structure of✘≤® the entire machine room a÷βλre integrated with the cabinet, gas fi'δ≠λre pipes, cabinets, and cold a÷ε✔ nd hot zone division devic€φφ♦es. This not only ensures ← π→the maximum production of the αλcabinet, but also minimizes the loss★✔₽ of operation and maintenanβ↑∞ce.
Hanwei Communication has been ad✘Ωφ©hering to the concept of "t♠ echnology serves the needs&qu™☆ ot; and provides services for vari÷ ous DC computer rooms andγ✘ IDC computer rooms, including:
Construction needs analysis and projeπ♠ct planning consulting ser vices;
Process design consul€♥≤✔ting services;
Bidding technical support services;∑•±
Project management consulting serv•★∑ices for the constructi≠≤on and implementation of computer room "♥©σprojects;
Acceptance consulting services;
Consultation service for establ ishment of operation and ma≠₹•♠intenance system;
Operation and maintenance o§€→utsourcing services.